Landscaping
 
The 8x10 twenty foot long timber on the left was installed in a waste water treatment tank as a piling for a wall structure. The six by six timbers on the truck were a special structural formula for a barrier wall in a city park.
Docks and Piers

These boards were off-cuts from a project to install a floating dock structure to hold process lines above a nuclear reactor.
Pile Guards
 
Bulkhead

Bull Chocks
|